scheduling (Q7494): Difference between revisions
Jump to navigation
Jump to search
Created claim: subclass of (P1): optimization problem (Q7495) |
Created claim: subclass of (P1): planning (Q290) |
||
Property / subclass of | |||
Property / subclass of: planning / rank | |||
Normal rank |
Latest revision as of 17:30, 29 April 2023
the process of arranging, controlling and optimizing work and workloads in a production process or manufacturing process; is used to allocate plant and machinery resources, plan human resources, plan production processes and purchase materials
- schedule
Language | Label | Description | Also known as |
---|---|---|---|
English | scheduling |
the process of arranging, controlling and optimizing work and workloads in a production process or manufacturing process; is used to allocate plant and machinery resources, plan human resources, plan production processes and purchase materials |
|